![]() |
| Sod from old surface is cut |
![]() |
| Every piece is numbered |
![]() |
| Sod is laid out row by row |
![]() |
| 1500 pieces of sod removed |
![]() |
| Drainage grids laid out after soil is removed . |
![]() |
| Drainage installed in the newly shaped subsurface |
![]() |
| New top mix installed |
![]() |
| 320 tons of top mix used |
![]() |
| New top mix watered and compacted |









No comments:
Post a Comment