Sod from old surface is cut |
Every piece is numbered |
Sod is laid out row by row |
1500 pieces of sod removed |
Drainage grids laid out after soil is removed . |
Drainage installed in the newly shaped subsurface |
New top mix installed |
320 tons of top mix used |
New top mix watered and compacted |
No comments:
Post a Comment