Sod from old surface is cut |
![]() |
Every piece is numbered |
![]() |
Sod is laid out row by row |
![]() |
1500 pieces of sod removed |
![]() |
Drainage grids laid out after soil is removed . |
![]() |
Drainage installed in the newly shaped subsurface |
![]() |
New top mix installed |
![]() |
320 tons of top mix used |
![]() |
New top mix watered and compacted |