14 Green Work Continues

Adding soil amendments to the compacted surface

Surface is raked and leveled

Sod goes back by the numbers

Plywood used to keep foot traffic off of the sod

A slow process


Half way there!

14 Green Rebuild

Sod from old surface is cut

Every piece is numbered

Sod is laid out row by row

1500 pieces of sod removed



Drainage grids laid out after soil is removed .

Drainage installed in the newly shaped subsurface

New top mix installed

320 tons of top mix used

New top mix watered and compacted

Sunday, September 15, 2013

Last Views of the 14th hole

The last cut
 Here are a few pictures of the 14th hole before the green complex was demoed..
The "easy " pin placement

View from the area of the new tee
The last birdie made on 14 was a downhill 30 foot snake by Gretchen McMahon. A great putt!

Saturday, September 14, 2013

Master Plan Work Begins

Equipment Arrives From Maryland

Removing old sand from 15 green bunkers

Area prepared for new tee on 15

Removing sod from 14 green

Reshaping the putting surface on 14 green

Re shaped bunker on 15 green

Establishing a new green surround on 14

4 feet of fill removed from the pit on 14 to be used during the project

Ryan Cox  project manager and Dave Fluery Architect/shapper