Friday, June 27, 2014
Member Guest 2014
Final prep for the 2014 Member Guest Tournament are complete. We are ready to go. Great job by my staff dotting all the I's and crossing all the T's.
Thursday, May 22, 2014
Master Plan Work 2013
Friday, May 16, 2014
Wednesday, May 14, 2014
New Greens Mowers
This season we will be using the newest technology in greens mowing. The Jacobsen Eclipse Greens Mower has been on the market for several years and as with all new technology some problems existed with the design and operating system. After tweaking the design and operating system the newest model of Eclipse mowers have been very successful and well received in the turf industry. The mower has an combustion engine that runs at a very low speed to power the generator system that runs the electric components which include a computer that is set by our Equipment Manager to provide consistent reel clip rate and operating speed. This ensures that all operators get the same results when mowing. By setting a constant clip rate and speed it is possible to mow a fraction higher than our present mowers with better results.
| Groundsman Chris Haro mowing the practice green with the new Eclipse mower |
Monday, May 5, 2014
Monday Maintenance
| Cutting rough |
Just a few of the work projects being performed today.
Our trusted rough mower Nick Gaeta is back smoothing the rough to a managable 2.5 inches and our annual sand injection into the green surfaces,"dryject", are in progress today.
Mowing of tees, colllars and approaches; green and tee bank mowing as well as tennis court maintenance are also on the schedule.
All the areas of new construction are now open and there were 2 birdies on the new 14th hole on Saturday during the men's golf opening tournament.
| Dryjecting Greens |
Subscribe to:
Comments (Atom)







